Phase 3 Modifications

Energy Engineering & Consulting Services, LLC Energy Engineering & Consulting Services, LLC

Energy Engineering &
Consulting Services, LLC

 
Home
Approach
Phase 1
Phase 1
Phase 2
Phase 3
Savings
Systems
Advantages
Services
Contact

GSA Contract #: GS-10F-0346S

 

     Phase 3 involves the modification of the existing systems to gain greater energy efficiency and reliability. The pressure chart recordings below show the before and after pressure of an air compressor system with three compressors. Modifications to the air-drying system were made to reduce the volume of waste air in the system. Another modification was to strategically locate air receivers in the system. The compressed air piping header and strategies of control were modified to increase the performance of the compressors. This project reduced the need for the operation of one air compressor and increased the system's pressure by 7 psig. The energy savings was approximately $52,000 per year and the simple payback period was 1.25 years.


Click image to enlarge


Click image to enlarge


Click image to enlarge


Energy Engineering & Consulting Services, LLC
765-922-7286
eecs@comteck.com