Results of Energy Savings Program

Energy Engineering & Consulting Services, LLC Energy Engineering & Consulting Services, LLC

Energy Engineering &
Consulting Services, LLC

 
Home
Approach
Phase 1
Phase 1
Phase 2
Phase 3
Savings
Systems
Advantages
Services
Contact

GSA Contract #: GS-10F-0346S

 


Click image to enlarge

The boiler plant efficiency energy savings was achieved by the following improvements:

  • Improving the combustion efficiency of the boilers
  • Optimizing the performance of the economizers for heat recovery
  • Resolving unnecessary heating on specific air handlers
  • Reducing steam header pressure and further reduction of steam pressure at strategic locations
  • Steam trap repairs
  • Improvement control to the deaerator
  • Improving the cycles of concentration of the boiler
  • Implementing changes to enhance the load being produced by each boiler


Click image to enlarge

The plant electrical cost savings was accomplished in Phase 1 and 2 by optimizing the performance of the following systems:

  • Chillers and chilled water systems
  • Compressors and compressed air systems
  • Air handlers and various exhaust systems
  • Control system's strategy for the chillers, cooling towers, and air handlers enhancement
  • Piping distribution systems
  • Vacuum and process exhaust systems
  • Roof top units' heating and cooling systems
  • Process ovens
  • Operational modifications on systems' parameters